EARTHMOVING
12-MEGALITRE AGRICULTURAL KEYLINE DAM
Excavation and compaction of a 12ML farm dam on steep terrain. Included clay core keyway, engineered rock-armoured overflow spillway, and topsoil batter revegetation.
Proven delivery across civil infrastructure, agricultural land reclamation, and forestry vegetation management throughout Victoria.
EARTHMOVING
Excavation and compaction of a 12ML farm dam on steep terrain. Included clay core keyway, engineered rock-armoured overflow spillway, and topsoil batter revegetation.
CIVIL WORKS
Constructed 1.2km of heavy-duty crushed rock access roads with subgrade geotextile, drainage swales, and culvert crossings for an 8-lot rural subdivision.
FORESTRY
Mechanical mulching of overgrown scrub, deadfall, and dense blackberry along perimeter boundary lines, complying fully with CFA 10/30 bushfire guidelines.
LAND CLEARING
Reclaimed neglected grazing acreage by clearing heavy tea-tree regrowth, extracting stumps, stick raking, and laser grading subsoil for pasture sowing.
CIVIL WORKS
Engineered Class 3 crushed rock roadway to handle daily B-double dairy tanker traffic, eliminating winter bogging with cambered drainage and stabilized subbase.
EARTHMOVING
Precision cut-and-fill pad excavation with 3D GPS laser control, 14T vibratory padfoot compaction, and geotechnical compaction sign-off.